{"id":1031,"date":"2023-07-26T12:43:56","date_gmt":"2023-07-26T09:43:56","guid":{"rendered":"https:\/\/publicconstruction.ro\/repair-and-protection-of-bridge-or-viaduct-piers\/"},"modified":"2023-08-10T14:00:08","modified_gmt":"2023-08-10T11:00:08","slug":"repair-and-protection-of-bridge-or-viaduct-piers","status":"publish","type":"page","link":"https:\/\/publicconstruction.ro\/en\/repair-and-protection-of-bridge-or-viaduct-piers\/","title":{"rendered":"Repair and protection of bridge or viaduct piers"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The repair and protection of bridge or viaduct piers aims to maintain and strengthen these essential structures. We use Mapei&#8217;s innovative products to ensure protection against damage caused by environmental factors and wear and tear, thereby extending the life of bridges and viaducts.<\/p>\n\n<p class=\"wp-block-paragraph\">Process include:<\/p>\n\n<ol class=\"wp-block-list\">\n<li>Inspection and assessment of existing damage to structural piles.<\/li>\n\n\n\n<li>Removing damaged material and cleaning the surface.<\/li>\n\n\n\n<li>Application materials for repair and protection, adapted to the specific needs of the structure.<\/li>\n\n\n\n<li>Quality control to ensure repairs and protection are carried out correctly.<\/li>\n\n\n\n<li>Regular monitoring and maintenance of piles to prevent further damage.<\/li>\n<\/ol><!--themify_builder_content-->\n<div id=\"themify_builder_content-1031\" data-postid=\"1031\" class=\"themify_builder_content themify_builder_content-1031 themify_builder tf_clear\">\n    <\/div>\n<!--\/themify_builder_content-->","protected":false},"excerpt":{"rendered":"<p>The repair and protection of bridge or viaduct piers aims to maintain and strengthen these essential structures. We use Mapei&#8217;s innovative products to ensure protection against damage caused by environmental factors and wear and tear, thereby extending the life of bridges and viaducts. Process include:<\/p>\n","protected":false},"author":1,"featured_media":650,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1031","page","type-page","status-publish","has-post-thumbnail","hentry","has-post-title","has-post-date","has-post-category","has-post-tag","has-post-comment","has-post-author",""],"builder_content":"","_links":{"self":[{"href":"https:\/\/publicconstruction.ro\/en\/wp-json\/wp\/v2\/pages\/1031","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/publicconstruction.ro\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/publicconstruction.ro\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/publicconstruction.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/publicconstruction.ro\/en\/wp-json\/wp\/v2\/comments?post=1031"}],"version-history":[{"count":1,"href":"https:\/\/publicconstruction.ro\/en\/wp-json\/wp\/v2\/pages\/1031\/revisions"}],"predecessor-version":[{"id":1032,"href":"https:\/\/publicconstruction.ro\/en\/wp-json\/wp\/v2\/pages\/1031\/revisions\/1032"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/publicconstruction.ro\/en\/wp-json\/wp\/v2\/media\/650"}],"wp:attachment":[{"href":"https:\/\/publicconstruction.ro\/en\/wp-json\/wp\/v2\/media?parent=1031"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}